Tirex ResourcesTechnical Summary Report
Email 'Drill Hole Highlights' item to a friend
Show printable version of 'Drill Hole Highlights' item in a New Window
Tirex Resources has intersected robust copper, zinc, gold and silver mineralization in four separate zones within the Mirdita District. These zones are named Koshaj, Letitna, South Gurthi No. 1 and South Gurthi No. 2. Tirex has engaged SRK Consulting (United Kingdom) to produce initial mineral resource estimates in compliance with Canadian National Instrument 43-101 for these areas. Some highlight drill results from these areas are noted below.


TABLE 3A: KOSHAJ DEPOSIT DRILL INTERSECTIONS
               
FROM
(m)
TO
(m)
INTERSECTION
(m)
COPPER
(%)
ZINC
(%)
LEAD
(%)
SILVER
(g/t)
GOLD
(g/t)
   
DRILL HOLE MR08-01
               
38.5
103.5
65.0
0.6
9.0
0.3
48.4
2.7
 
 
 
 
 
 
 
 
Including
38.5
42.2
3.7
0.8
16.3
0.9
118.6
8.3
 
 
 
 
 
 
 
 
Including
40.4
41.2
0.8
1.4
53.8
2.2
369.6
29.5
 
 
 
 
 
 
 
 
Including
52.8
66.9
14.1
0.9
11.6
1.0
141.6
5.5
 
 
 
 
 
 
 
 
Including
63.8
66.9
3.1
2.3
34.8
2.4
376.1
14.6
 
 
 
 
 
 
 
 
Including
76.0
103.5
27.5
0.8
12.5
0.1
13.0
2.2
   
DRILL HOLE MR08-02
               
74.3
134.6
60.4
1.1
6.7
0.1
17.7
1.6
 
 
 
 
 
 
 
 
Including
75.3
78.9
3.7
2.4
33.2
1.1
172.0
8.6
 
 
 
 
 
 
 
 
Including
75.3
75.9
0.7
7.3
27.3
1.8
310.5
15.1
 
 
 
 
 
 
 
 
Including
116.8
132.7
15.9
1.2
11.4
0.1
15.2
2.0
   
DRILL HOLE MR08-03
               
121.6
134.5
12.9
0.5
4.4
0.6
44.5
1.7
 
 
 
 
 
 
 
 
Including
121.6
124.1
2.5
0.4
11.3
2.6
135.0
5.4
 
 
 
 
 
 
 
 
Including
132.8
134.5
1.7
2.9
14.5
0.8
107.4
4.2
   
DRILL HOLE MR08-04
               
88.70
124.60
35.9
0.23
3.18
0.09
13.9
1.0
 
 
 
 
 
 
 
 
Including
88.7
91.6
2.9
0.48
5.42
0.94
132.8
4.2
 
 
 
 
 
 
 
 
Including
88.7
89.3
0.6
1.01
21.27
4.23
612.0
18.0
 
 
 
 
 
 
 
 
Including
103.6
124.6
21.0
0.32
4.64
0.02
5.1
1.0
 
 
 
 
 
 
 
 
Including
103.6
116.6
13.0
0.43
5.26
0.02
6.8
1.2
 
 
 
 
 
 
 
 
Including
110.6
115.6
5.0
0.48
7.88
0.02
5.6
1.3
   
DRILL HOLE MR08-05
               
137.9
153.9
16.0
1.0
5.2
0.04
11
1.7
 
 
 
 
 
 
 
 
Including
145.9
146.9
1.0
1.6
15.2
0.14
57
5.1
 
 
 
 
 
 
 
 
Including
151.8
152.9
1.1
1.8
18.1
0.18
41
4.1
   
DRILL HOLE MR08-06
   
152.0
170.9
18.9
0.60
3.43
0.22
20.2
1.1
 
 
 
 
 
 
 
 
Including
158.1
163.7
5.6
1.70
6.72
0.02
7.2
1.1
   
DRILL HOLE MR08-07
   
163.5
185.65
22.2
0.29
1.70
0.10
10.1
0.6
 
Including
163.5
164.1
0.6
1.39
11.34
0.09
26.7
2.0
 
 
 
 
 
 
 
 
Including
179.1
179.7
0.6
5.71
9.15
0.25
144.6
14.1


TABLE 3B: GURTHI SOUTH No. 2 DRILL INTERSECTIONS
             
FROM
(m)
TO
(m)
INTERSECTION
(m)
COPPER
(%)
ZINC
(%)
SILVER
(g/t) 
GOLD
(g/t)
             
DRILL HOLE MR08-16
             
125.4
139.2
13.9
3.5
0.6
7.5
1.3
Including
126.3
129.9
3.7
10.6
0.2
6.5
2.9
Including
126.3
127.4
1.1
13.6
0.2
11.5
7.4
             
DRILL HOLE MR08-25
             
120.0
127.1
7.1
5.9
0.7
37.5
3.4
Including
122.0
126.7
4.7
7.0
0.7
40.8
3.9
Including
126.1
126.7
0.6
12.8
0.2
24.6
4.9


GURTHI SOUTH No. 1 ZONE DRILL RESULTS
FROM
(m)
TO
(m)
INTERSECTION
(m)
COPPER
(%)
ZINC
(%)
SILVER
(g/t)
GOLD
(g/t)
             
DRILL HOLE MR10-60
249.5
257.2
7.7
5.23
1.84
57
4.6
including
250.5
254.5
4
6.92
2.53
84.6
6.8
including
251.5
253.5
2
7.5
3.78
124.6
8.2


TABLE 3C: LETITNA ZONE DRILL INTERSECTIONS
             
FROM
(m)
TO
(m)
INTERSECTION
(m)
COPPER
(%)
ZINC
(%)
SILVER
(g/t)
GOLD
(g/t)
             
DRILL HOLE MR09-37
             
134.20
195.65
61.5
0.57
1.56
10.6
0.7
Including
134.20
140.40
6.2
1.17
0.47
0.9
0.3
Including
138.30
139.50
1.2
3.84
0.03
1.7
0.4
Including
144.90
146.00
1.1
2.32
0.03
1.4
1.4
Including
152.15
160.35
8.2
0.16
3.47
2.6
1.9
Including
155.10
157.00
1.9
0.24
4.38
6.4
6.0
Including
167.10
172.60
5.5
0.98
1.11
28.9
0.9
Including
167.10
167.50
0.4
1.36
2.52
45.4
1.8
Including
174.25
185.45
11.2
0.32
2.87
19.9
1.1
Including
177.95
179.50
1.6
0.07
5.63
33.5
3.1
Including
186.60
189.10
2.5
2.86
3.09
24.4
2.0
   
DRILL HOLE MR09-38
             
147.7 182.8
35.1
1.25
0.42
4.9
0.9
Including  
166.7 174.65
8.0
1.85
1.39
8.2
1.6
Including  
171.65 174.65
3.0
2.25
3.47
9.0
2.3
Including  
178.7 182.8
4.1
2.19
0.50
14.6
1.2
             
DRILL HOLE MR09-39
             
112.2 117
4.8
2.49
0.06
1.8
0.6
Including  
114.95 115.85
0.9
4.50
0.03
2.5
0.9
And  
172.23 178.4
6.2
0.18
6.34
17.4
1.4
Including  
176.4 177.4
1.0
0.26
19.00
13.0
4.2
             
DRILL HOLE MR09-40
             
126 128.1
2.1
0.11
7.27
16.0
1.2
Including  
127.2 128.1
0.9
0.09
13.80
25.2
2.1
And  
143.71 189.65
46.0
0.70
2.68
20.8
1.6
Including  
148.7 159.75
11.1
2.18
3.80
38.0
4.0
Including  
148.7 156.75
8.1
2.59
4.70
39.7
5.1
Including  
149.7 151.7
2.0
2.54
6.74
18.3
14.1
Including  
150.7 151.7
1.0
2.48
9.02
19.2
16.8
Including  
154.67 155.75
1.1
10.30
1.14
77.8
1.7
Including  
169.75 170.95
1.2
0.11
13.15
47.7
5.2
Including  
183.8 185.8
2.0
0.11
5.17
24.7
2.3
             
DRILL HOLE MR09-41
             
129.98 180.8
50.8
0.49
2.22
14.9
0.9
Including  
151.72 156.55
4.8
2.27
0.84
9.1
0.6
Including  
155.87 156.55
0.7
9.78
2.09
17.3
0.5
Including  
159.8 161.73
1.9
0.53
22.48
61.2
9.2
Including  
159.8 160.77
1.0
0.94
37.84
99.0
17.0
Including  
171.3 174.3
3.0
0.29
2.84
28.2
1.5
             
DRILL HOLE MR09-42
             
132.00
135.00
3.00
1.16
0.46
4.3
0.9
 
 
151.75
182.00
30.25
1.04
1.16
8.2
1.1
Including
154.60
157.00
2.40
1.63
1.33
13.9
1.1
Including
162.00
166.00
4.00
3.87
0.30
9.5
0.7
Including
162.00
163.30
1.30
5.40
0.30
6.7
0.4
             
DRILL HOLE MR09-43
             
110.00
111.10
1.1
3.10
0.02
3.0
1.2
And
129.00
133.95
4.9
0.66
0.02
1.0
0.3
             
DRILL HOLE MR09-47
             
126.8 144.8
18.0
0.41
2.98
14.0
1.5
Including  
126.8 133.8
7.0
0.13
5.61
22.5
2.6
Including  
129 133.8
4.8
0.18
7.97
12.0
3.6
Including  
130.05 131.1
1.0
0.57
14.55
20.8
8.1
Including  
133.4 133.8
0.4
0.24
43.40
23.8
12.2
Including  
142 144.8
2.8
2.18
3.87
25.6
3.2
             
DRILL HOLE MR09-48
             
154.98
157.28
2.30
0.29
2.08
14.3
0.3
Including
154.98
155.40
0.42
0.06
3.49
16.5
0.4
             
DRILL HOLE MR09-49
             
137.8 149.75
12.0
0.91
4.00
14.1
2.4
Including  
141 143
2.0
0.67
11.56
36.9
4.7
Including  
141 142
1.0
1.23
8.07
22.2
7.3
Including  
146.6 149.2
2.6
2.24
1.99
20.0
4.4
Including  
148.65 149.2
0.5
3.41
1.95
22.1
14.8
 
Tirex Resources Ltd.