Flash Player is required to play this animation


| | | October 14, 2009 Drilling Completed over 255m (837 ft) of Strike Length at Letitna, Zone Open in Every Direction, Step Out Drilling Continues
|
| | Hello Everybody,
Letitna is demonstrating increased size potential with every drill hole. This is a thick zone of mineralization, open in every direction.
Tirex has now drilled holes over 255 metres (837 feet) of strike length at Letitna and step out drilling continues. Further assays are pending from multiple holes.
The intersection released today (estimated as close to True Width), returned 30.25m (99.25 feet) of 1.04% Copper, 1.16% Zinc, 8.2 g/t Silver and 1.1 g/t Gold.
In addition to step out drilling at Letitna, which is ongoing, Tirex is also targeting new discovery potential on the previously undrilled East Slope Trend.
Regards,
Bryan |
| |
| | You can view the Previous President's Corner item: Wed Oct 21, 2009, Tirex Resources - Albanian Update
You can view the Next President's Corner item: Wed Oct 7, 2009, Tirex Resources To Drill Previously Undrilled East Slope Trend
You can return to the main President's Corner page, or press the Back button on your browser.
|
|