KOSHAJ DEPOSIT DRILL INTERSECTIONS
DRILLHOLE
FROM (m)
TO (m)
INTERSECTION (m)
COPPER (%)
ZINC (%)
LEAD (%)
SILVER (g/t)
GOLD (g/t)
MR08-01
38.5
103.5
65.0
0.6
9.0
0.3
48.4
2.7
Including
42.2
3.7
0.8
16.3
0.9
118.6
8.3
40.4
41.2
1.4
53.8
2.2
369.6
29.5
52.8
66.9
14.1
11.6
1.0
141.6
5.5
63.8
3.1
2.3
34.8
2.4
376.1
14.6
76.0
27.5
12.5
0.1
13.0
MR08-02
74.3
134.6
60.4
1.1
6.7
17.7
1.6
75.3
78.9
33.2
172.0
8.6
75.2
75.9
0.7
7.3
27.3
1.8
310.5
15.1
116.8
132.7
15.9
1.2
11.4
15.2
2.0
MR08-03
121.6
134.5
12.9
0.5
4.4
44.5
1.7
124.1
2.5
0.4
11.3
2.6
135.0
5.4
132.8
2.9
14.5
107.4
4.2
MR08-04
88.70
124.60
35.9
0.23
3.18
0.09
13.9
88.7
91.6
0.48
5.42
0.94
89.3
1.01
21.27
4.23
612.0
18.0
103.6
124.6
21.0
0.32
4.64
0.02
5.1
116.6
0.43
5.26
6.8
110.6
115.6
5.0
7.88
5.6
1.3
MR08-05
137.9
153.9
16.0
5.2
0.04
11
145.9
146.9
0.14
57
151.8
152.9
18.1
0.18
41
4.1
MR08-06
152.0
170.9
18.9
0.60
3.43
0.22
20.2
158.1
163.7
1.70
6.72
7.2
MR08-07
163.5
185.65
22.2
0.29
0.10
10.1
164.1
1.39
11.34
26.7
179.1
179.7
5.71
9.15
0.25
144.6
MR08-08
130.6
148.6
0.56
0.06
0.00
145.6
1.08
3.9
MR08-09
158.5
158.9
3.23
0.11
GURTHI-SOUTH No. 2 ZONE DRILL INTERSECTIONS
MR08-15
114.50
119.70
0.31
3.90
22.4
0.84
127.93
130.65
2.25
128.93
2.35
0.87
11.8
MR08-16
125.4
139.2
3.5
7.5
126.3
129.9
10.6
0.2
6.5
127.4
13.6
11.5
7.4
MR08-18
110.45
127.00
16.6
0.55
2.10
1.9
117.20
121.90
4.7
4.19
120.15
0.53
3.97
3.3
5.9
MR08-21
166.25
172.30
6.10
3.11
24.1
168.85
171.55
2.70
6.65
2.26
170.45
8.46
1.79
23.2
MR08-22
97.50
99.20
1.12
1.40
MR08-25
120.0
127.1
7.1
37.5
3.4
122.0
126.7
7.0
40.8
126.1
12.8
24.6
4.9
MR08-31
104.45
107.45
3.0
1.18
106.45
1.66
LETITNA ZONE DRILL INTERSECTIONS
MR08-37
134.20
195.65
61.5
0.57
1.56
140.40
6.2
1.17
0.47
138.30
139.50
3.84
0.03
144.90
146.00
2.32
152.15
160.35
8.2
0.16
3.47
155.10
157.00
0.24
4.38
6.4
6.0
167.10
172.60
0.98
1.11
28.9
167.50
1.36
2.52
45.4
174.25
185.45
11.2
2.87
19.9
177.95
179.50
0.07
5.63
33.5
186.60
189.10
2.86
3.09
24.4