| To view the photograph on its own, click on the Photograph. To view the Photograph WITH a description of the photograph (recommended), click on the Photograph title in red
|
A Tirex equipment operator working hard in the Letitna area. Letitna is an area of significant size potential 130 KB, approx. 25 seconds at 56.6Kbps |
|
On the footpath to an initial Letitna drill site. Letitna is an area of focus due to its very large size potential 251 KB, approx. 48 seconds at 56.6Kbps |
|
Energold drills, used by Tirex, are highly portable 290 KB, approx. 55 seconds at 56.6Kbps |
|
Making some small access improvements to initial drill sites in the Letitna area 273 KB, approx. 52 seconds at 56.6Kbps |
|
Dr. Allan Miller, Tirex Chief Geologist, conducting field work at Mirdita 124 KB, approx. 24 seconds at 56.6Kbps |
|
A nice day shaping up at Mirdita 45 KB, approx. 9 seconds at 56.6Kbps |
|
Tirex is utilizing new drill technology at Mirdita. Shown here is a Canadian made Energold drill 743 KB, approx. 2 minutes, 19 seconds at 56.6Kbps |
|
Looking down at the Tirex camp facilities. The camp is set up for year-round large-scale, intense exploration. 268 KB, approx. 51 seconds at 56.6Kbps |
|
Government construction of a four lane highway, right through the property, is dramatically improving already favourable logistics 297 KB, approx. 56 seconds at 56.6Kbps |
|
Looking up at the Old Man Mountain area 192 KB, approx. 37 seconds at 56.6Kbps |
|
The Tirex field office onsite at Mirdita 356 KB, approx. 1 minute, 7 seconds at 56.6Kbps |
|
Dr. Allan Miller, Chief Geologist, conducting field work in a highly prospective area at Mirdita. 549 KB, approx. 1 minute, 43 seconds at 56.6Kbps |
|